Location Agigea, Constanta Status Finalized Works Entire execution of the Bridge Divizion Apolodor Beneficiary CNAPM
Cable – stayed bridge, having an opening of 180 m, 420 m length and two viaducts of 240 m each.
Two piles, having a 65 m height, sustain the bridge with steel cables.
It has the longest opening in Romania between piles (200 m), and together with the viaducts, it forms a connection of 907 m between the two banks of the canal.
Installation of the second deck at the Agigea Bridge